Cockpit view on approach to a remote Arctic runway between a fjord and mountains
Airport

Upgrading and Running a Remote Airport in Greenland

Location: Greenland

How we did it

A mining project in Greenland depended on a remote gravel airport that could not operate all year. The project team wanted to know what upgrading it and running it would really take.

Challenge
  • A gravel airport that cannot operate year round.
  • No lighting, few services and little support on site.
Solution
  • CAPEX for runway, apron, drainage and lighting works.
  • OPEX for staff, equipment, fuel and shipping to site.
  • Air access options for crew rotations compared.
Result
  • A full CAPEX and OPEX picture to plan the airport and its operation.
Learn more

A mining project in Greenland depended on a remote gravel airport that could not operate all year. It had no airfield lighting, few services and little support on site. Before committing, the project team needed to know two things: what the works would cost, and what it would take to run the airport year after year. We built the CAPEX for the runway, apron, drainage and lighting works, then the OPEX for staff, equipment, fuel and shipping to site, and compared air access options for crew rotations. The project now has a full picture to plan its airport and its operation.

Survey stake on northern tundra
Mine

Aerodrome Design for a Northern Mine Site

Location: Quebec, Canada

How we did it

A mining company was planning a new mine in a remote northern region with no airfield on site. Air access had to be designed before the project could move ahead.

Challenge
  • Remote mine project, no airfield yet.
  • Needed a plan and a cost it could rely on.
Solution
  • Site validated in person.
  • Airfield layouts and mobilization plans for heavy aircraft.
  • Design report and Class D cost estimate.
Result
  • A clear technical and financial roadmap.
  • Costs more than 5x lower than first proposed.
Learn more

A remote mine project had no airfield yet. Before going further, it needed two things: a plan and a cost it could rely on. We validated the site in person, then designed airfield layouts and mobilization plans for heavy aircraft and northern logistics. We delivered an engineering design report and a Class D construction cost estimate. The project now has a clear technical and financial roadmap for its mine airstrip, at a cost more than five times lower than first proposed.

Four trainees in high-visibility vests on an apron, Cirrus pickup truck behind
TrainingAirport

A Training Academy at Mirabel, With SDBJ

Location: Quebec, Canada

How we did it

SDBJ manages airports in northern Quebec and hires ground staff from outside aviation. It wanted one consistent way to prepare them before they start.

Challenge
  • New ground staff came from heavy equipment, not aviation.
  • No real scenarios to practise on site.
Solution
  • Turnkey academy built with SDBJ after a successful pilot.
  • One intensive week at Mirabel, on live operations.
  • Airside safety, de-icing, heavy loads, human factors, forklift, SMS.
Result
  • Crews start with more confidence.
  • One standard across every SDBJ site.
  • Lower training costs; better onboarding and retention.
Learn more

SDBJ's new ground staff came from heavy equipment, not aviation, and training on site offered no real scenarios to practise on. After a successful pilot, we built a turnkey academy with SDBJ: one intensive week at Mirabel, on live operations, with modules by role, from airside safety and de-icing to heavy loads, human factors, forklift and SMS. This aviation training gives crews more confidence from day one and one standard across every site SDBJ manages. SDBJ reports lower training costs, better onboarding and better retention.

Source: SDBJ, Rapport annuel 2025, p. 32.

Radio and operations desk overlooking a northern runway
Airport

Airport Managers, on Short Notice

Location: Quebec and Nunavut, Canada

How we did it

An airport cannot operate for long without a manager in place. When the role suddenly opens up, a qualified person has to step in quickly.

Challenge
  • Airports faced a manager gap.
  • Without one, they risked closing.
Solution
  • Qualified relief managers deployed fast.
Result
  • Operations kept running through the transition.
Learn more

When an airport loses its manager, the role cannot stay empty for long: without relief, the airport risks having to close. We deployed qualified relief airport managers on short notice to keep the role covered. Through that airport management cover, operations kept running for the whole transition.

More Projects

Aerial view of sea ice and snow
Mine

Building a Mine With No Road: Ice Runway or Helicopters?

Location: Quebec, Canada

How we did it

A remote northern mine project was getting ready for construction with no road to the site. Air logistics would shape the schedule and a large share of the budget.

Challenge
  • No road access for construction.
  • Every load has to fly in.
Solution
  • Ice runway and helicopter airlift compared side by side.
  • Costs, risks and season windows for each.
Result
  • A clear basis to choose the construction air plan.
Learn more

A mine project was heading into construction with no road access, so every load would have to fly in. The real question was how: build an ice runway, or move the freight by helicopter airlift? Each option changes the schedule, the cost and the risk. We compared the two side by side, with the costs, the risks and the season windows of each. The project team now has a clear basis to choose its construction air logistics plan.

Runway at dusk with edge lights
Airport

A Larger Aircraft on a Restricted Runway

Location: Quebec, Canada

How we did it

An airport operator wanted to welcome larger jet aircraft on its existing runway. The runway's limits had to be squared with the rules before any service could begin.

Challenge
  • Runway weight limits blocked jet access.
Solution
  • With Transport Canada, we set aircraft weights that meet the standards.
Result
  • Jet service started safely.
Learn more

An engineering report limited jet access at an airport because of runway weight restrictions. For the airport's operations, that meant larger aircraft could not come in, and the service it needed stayed out of reach. Working with the operator and Transport Canada, we set aircraft weights that meet safety and regulatory standards for that runway. With those weights in place, jet service started safely at the airport.

Hands on a tablet showing a procedure checklist in a hangar, turboprop behind
Digital

An AI Agent That Drafts Procedures

Location: Alberta and Quebec, Canada

How we did it

An aviation operation relied on detailed written procedures and task cards to keep its work consistent. Drafting and updating them was a steady load on the team.

Challenge
  • Procedures and task cards took several people's time.
Solution
  • Process mapped step by step. The agent drafts; a person reviews every output.
Result
  • The agent does 80% of the drafting. The team moves to higher-value work.
Learn more

In an aviation operation, writing procedures and task cards took up the time of several employees. That drafting is necessary work, and every hour spent on it is an hour taken from other tasks. We mapped the process step by step, then built an AI agent that drafts the procedures and task cards. A person reviews every output. The team now spends more of its time on higher-value work in its aviation operations.

Hand on the throttles in an airliner cockpit
Training

A Centre of Excellence for an Aviation Company

Location: Quebec, Canada

How we did it

An aviation company trained its crews through several separate programs. It wanted all of that training to follow one approach.

Challenge
  • Training was spread out, with uneven methods.
Solution
  • One centre of excellence: unified, high-level programs.
Result
  • Better learning, one standard.
Learn more

An aviation company's training was spread out, and the methods varied from one program to the next. When each program teaches its own way, crews come out with different habits and the company has no single standard to hold them to. We brought the training together in one centre of excellence, with unified programs. The result is better learning and one standard across the company's aviation training.

Windsock at a northern airport
Airport

Closing Transport Canada Findings

Location: Quebec, Canada

How we did it

A certified northern airport received findings from Transport Canada. Each one had to be answered with a clear, documented fix.

Challenge
  • Findings at a certified northern airport.
Solution
  • Coverage matrix; checklists tied to each regulation.
Result
  • Each finding mapped to its fix.
Learn more

Transport Canada findings at a certified northern airport meant every system had to be reviewed against the regulations. We built a coverage matrix by system, rewrote or created the checklists so each question ties back to its regulation, and wrote a compliance note that maps each finding to its fix. The airport has a clear line from each finding to its correction, organized around the requirements of its airport certification.

Fuel bladder strapped down in an aircraft cargo hold
AirportDigital

An Airport Operations Manual With a Fuel Program

Location: Quebec, Canada

How we did it

A northern airport wanted its staff to work from one current set of procedures. That reference also had to cover how fuel is handled on site.

Challenge
  • A northern airport needed one current reference.
Solution
  • Operations manual: ground handling, passengers, SMS.
  • Fuel program built in, with a digital tracking tool.
Result
  • One reference for staff, fuel included.
  • Fuel operations tracked digitally.
Learn more

A northern airport needed one current reference for its staff, so the people who run the airport work from the same document. We wrote its airport operations manual, covering ground handling, passengers and SMS, and built the fuel program into it, with a digital tool to track fuel operations. Staff now work from a single reference, fuel included, and fuel operations are tracked digitally.

Grader working on a gravel runway
Mine

CBR Testing at a Mine Runway

Location: Nunavut, Canada

How we did it

A northern mine planned to bring aircraft onto its gravel runway. The operation needed proof that the surface could carry them.

Challenge
  • Could the gravel runway carry the aircraft?
Solution
  • 141 penetrometer tests, then analysis.
Result
  • Runway found adequate as tested.
Learn more

Before relying on a mine's gravel runway, the operation needed to know whether it could carry the aircraft it planned to use. Guessing wrong would mean either restricting operations or putting aircraft on a surface that might not hold them. We ran a series of penetrometer tests on the runway, then analyzed the results (CBR runway testing). The mine airstrip was found adequate as tested.

Two workers in hard hats at a mine site
AirportMine

What Nearby Mines Mean for a Northern Airport

Location: Quebec, Canada

How we did it

A northern airport in a mining region was planning for the years ahead. Mining activity nearby could change how much air service it would need.

Challenge
  • A northern airport looked at its future demand.
Solution
  • Mining projects around it mapped, with their air needs.
Result
  • A view of the air service they could bring.
Learn more

A northern airport wanted to look ahead at its future demand, and the mining projects in its region were part of the picture. Planning an airport is hard without knowing who will need it. We mapped the mining projects around it, along with their air logistics needs. The airport now has a view of the air service those projects could bring.

Airliner at the gate with ground crew and a tug on the apron

And Many More

  • 3-year dangerous-goods training contract
  • Aerodrome manager program
  • Dust-suppressant product analysis
  • On-site observation reports
  • Confined space, OHS, forklift, de-icing, CRO-A training

Have a Complex Challenge? Let's Talk. We'll Deliver.

Tell us where and what. We'll help you complete the mission.

  • Mines
  • Airports
  • Training
  • Digital