Aerodrome Design and Feasibility
A new aerodrome or a longer runway starts with one question: can it carry the mission? We help regional, municipal and mine aerodromes answer it, from the first site visit to the detailed plan. We help you accomplish the mission.
Who Is It For?
Regional and municipal airports planning a new runway, a longer one or a new apron. Mine projects that need an airstrip before there is a road. Construction projects that need a temporary aerodrome while the site is built.
What Does Cirrus Do?
Feasibility Studies and Site Selection
We go to the site, compare locations and check whether the aerodrome can serve your traffic, aircraft and seasons. You get an aerodrome feasibility design to lender due diligence standards.
The Aviation Section of Your Pre-Feasibility Study
For mine projects, we write the aviation section of the pre-feasibility study: airfield layouts, aircraft options, a design report and a cost estimate.
Preliminary Design and Detailed Plan
A preliminary design, also called conceptual design, sets the layout and the cost. The detailed plan turns it into construction-ready drawings and specifications, delivered in collaboration with you and your suppliers and sealed by an engineer.
Runway, Taxiway and Apron Layout
Runway length and orientation, crosswind, runway strips and runway end safety areas, taxiways, apron size and lighting, set for the aircraft you plan to use.
Source: TP312.
Obstacles and Approaches
TP312 sets obstacle limitation surfaces around a runway, including the approach, take-off and transitional surfaces. We check terrain, trees and buildings against them early, because they can move a runway or limit how it is used.
Source: TP312.
Ice Runways and Gravel Runway Testing
We plan seasonal ice runways and compare them with other ways to fly the freight in. On gravel runways, we run CBR testing to check whether the surface can carry the aircraft. See our projects.
Aerodromes for the Construction Phase
Before permanent infrastructure exists, we survey and design temporary airstrips, ice pads and helicopter staging zones. Construction air logistics.
Planning the airport's long term future rather than one project? See our airport master plan.
Design at Each Stage of a Mine Project
The aerodrome grows with the mine.
- Exploration and scouting. A site visit and the preliminary design of the airstrip.
- Pre-feasibility study. Airfield layouts, a design report, a cost estimate and the aviation section of the study.
- Feasibility study and permitting. The aerodrome design basis, with runway length, crosswind, lighting and obstacles, and support with the registration or certification file.
- Construction. Temporary airstrips, ice runways and CBR testing.
- Production and FIFO operations. A runway kept fit for the aircraft that fly the crews.
Who Does the Work?
Our aerodrome design team, who have planned airstrips for northern mines and regional airports and know what Transport Canada looks for. The detailed plan is sealed by an engineer and delivered in collaboration with you and your suppliers.
How Does a Design Project Work?
- Mission profile. We start with your traffic, aircraft, seasons and the people who will use the aerodrome.
- Site visit. We validate the site in person and compare locations, terrain and obstacles.
- Preliminary design. Layouts, a design report and a cost estimate, so you can decide whether and where to build.
- Detailed plan and file. The detailed plan, prepared in collaboration with you and your suppliers and sealed by an engineer, the design basis checked against TP312 or Subpart 1, and time in the schedule for the consultation the CARs require. Transport Canada certifies or registers; we help prepare the file.
- Construction and first season. CBR testing, ice runway planning and support until the aerodrome is in use. We can then help with the airport operations manual.
Frequently Asked Questions
What does an aerodrome feasibility study cover?
It checks whether an aerodrome can serve your mission on a given site: traffic, aircraft, seasons, runway length, obstacles and cost. It ends with a layout and a cost estimate you can take to your board, council or lenders.
Can you write the aviation section of our pre-feasibility study?
Yes. For mine projects, we write the aviation section of the study, with airfield layouts, aircraft options, a design report and a cost estimate.
Does a new aerodrome or runway need a consultation?
Often, yes. Building a new aerodrome, building a new runway for aeroplanes or extending one beyond a set threshold is aerodrome work under the CARs. The proponent must consult the interested parties the regulations list, such as Transport Canada, air navigation service providers, nearby aerodrome operators and the local land use authority. Some aerodromes are excluded, such as water aerodromes and those used mainly for helicopters. We build the consultation into the schedule.
Sources: CAR 307.01 to 307.04, CAR 302.02.
Do we have to design to TP312?
TP312 is the standard for certified airports. A registered aerodrome or a private strip follows Subpart 1 of Part III instead. If the aerodrome may be certified later, designing to TP312 from the start can avoid rework. See TP312 compliance.
Sources: CAR 300.01, CAR 301.01, CAR 302.03, TP312.
How do obstacles affect the design?
TP312 defines obstacle limitation surfaces, including the approach, take-off and transitional surfaces. Terrain or structures that penetrate them can change where the runway goes, where the threshold sits or how the runway is used. We check them during site selection.
Source: TP312.
Can you plan an ice runway or test a gravel runway?
Yes. We plan seasonal ice runways and compare them with helicopter airlift on cost, risk and season windows. On gravel runways, we run CBR testing to check whether the surface can carry the aircraft. See our projects.
Who approves the aerodrome?
Transport Canada certifies airports and registers aerodromes. Cirrus prepares the design and helps with the file; we do not certify or register anything.
Sources: CAR 301.03, CAR 302.03.